Huairen Coal Mine cooperated with our company to install a 55-inch LCD splicing screen. The project has been installed by the installation engineer of Qunmao, and it has been put into use normally after passing the test.
In order to implement efficient monitoring in the monitoring room, a liquid crystal monitor is installed in the room, which is conducive to solving various factors that are not conducive to the operation of the machine room, such as flooding, fire, power outage, and service period failure. Unparalleled regulatory efficiency.
Installed and put into use
The above is the construction case of Jilin Changchun monitoring room and our company to install LCD monitors.